Commit Graph

  • 1619285ce0 Retire SPECS.md main bl 2026-08-16 15:05:01 +02:00
  • 5d29bdc4bd Pre-0.1 cleanup: fmt, docs, licenses, AUR-ready packaging bl 2026-08-16 15:04:22 +02:00
  • c52c3b1238 Release pipeline: cargo-release config + Gitea Actions workflows bl 2026-08-16 14:54:17 +02:00
  • 4033c0ffab Protocol v2: trusted-peer push, truthful partials, split downloads bl 2026-08-16 14:52:27 +02:00
  • ad69f7d884 Migrate to iroh 1.0 and iroh-blobs 0.103 bl 2026-08-16 14:03:15 +02:00
  • a2d150225a Point workspace repository at the new uhhm home bl 2026-08-16 12:44:47 +02:00
  • 8c98c00549 socket-api feature: make the daemon core embeddable in-process bl 2026-08-16 12:41:01 +02:00
  • 258fa072aa Milestone 6: DiscoveryProvider seam, signed announcements, redoal sketch bl 2026-07-15 09:51:57 +02:00
  • 871280553e Milestone 5: metered awareness, DSCP, systemd, man pages, packaging bl 2026-07-15 08:07:24 +02:00
  • 20bdf56668 Milestone 4: LAN discovery, trust gate, auto-sync, rate limits, events bl 2026-07-14 22:27:58 +02:00
  • 61171a5ea8 Milestone 3: iroh endpoint, tickets, pin-triggered fetch bl 2026-07-14 21:18:25 +02:00
  • e256f73439 Milestone 2: persistent blob store, add/materialize/gc bl 2026-07-14 20:47:11 +02:00
  • 4e1a95613b Milestone 1: workspace skeleton, wire protocol, socket round-trip bl 2026-07-14 20:10:29 +02:00